Category Archives: WiPs

April’s progress report {WiPs}

I am one of those folks that need a list to get things done. It helps me in two ways, keeps everything in order that I can no longer keep track of in my head, and also helps me celebrate when things get checked off the list. Additionally, posting my “to do” list here, provides me a level of accountability.

The list of things that are currently active is probably a little crazy at the moment. I finally have realized that I am never going to be a one project kind of girl ;-).

Almost finished, is this piece, NY High Line. The straight line quilting is progressing, and I see the light. This has been the project that I have avoided and severely procrastinated over. The 1/2″ quilting lines are color thread matched.

Some of my book projects are also coming along. I started the rainbow medallion quilt this week and I love how it’s already coming to life. I decided to break out my Carolyn Friedlander stash for this one.

I am loving traveling with this needle turn applique project (Manicured Garden). It’s perfect for all the wait-times in the airport and flying time.

The complete list of projects and stages is:

Project Dates Current Status
 NY High Line  April  TOP, BACK, BASTE, QUILT (Underway), BIND
 Medallion  May  TOP (Underway), BACK, BASTE, QUILT, BIND
 Project 1 (Secret)  June  TOP, BACK, BASTE, QUILT, BIND
 Project 2 (Secret)  July  TOP, BACK, BASTE, QUILT, BIND
Project 3 (Secret) August TOP, BACK, BASTE, QUILT, BIND
Graveyard August TOP, BACK, BASTE, QUILT, BIND
 Trellis  September  TOP, BACK, BASTE, QUILT, BIND
 Manicured Garden September TOP (Underway), BACK, BASTE, QUILT, BIND
 Abstract Triangles II & III  May  Pattern Release
 Phased Circles & Lunar Lines  June  Pattern Release
 Square Dance  July  Pattern Release

That’s my progress this week. I’ll check in each month here on my blog but you can always catch-up on my Instagram feed (ml_wilkie). How do you all keep track of your projects? Are you a one project or multi-project kind of person?

Reigniting Creativity + Giveaway

I am excited to see the progress in some of my projects at the moment. Things are finally moving forward. I am traveling a bit for work at the moment, which has led to a great opportunity to diversify my projects. I think it has reignited my creativity.

I took a great class with Season Evans on hand quilting small stitches at QuiltCon. Since taking that class I am now confident in tackling the hand quilting I want to add to Orange Creamsicle quilt top. Luckily, I have a trip scheduled next week, so with my 28wt Aurifil thread in hand, I can start adding some of those lines.

The other travel project at the moment, is an applique project for my book. The blocks have been a lot of fun and I have found them relaxing. I have really enjoyed playing with selections of fabrics from my Alison Glass stash.

The bottom right block is all basted and ready for stitching. I now have plenty of choice in thread colors with my new box set of 80 wt threads, that I picked up this week from the Fat Quarter Shop. It’s fantastic for applique, you hardly see the stitches.


(FYI…I am using #ideadesigncreatequilt if you want to check out progress of my book projects over the next year).

Giveaway

UPDATE: Giveaway closed, winners have been contacted (Emily + Wendy).

Since, I bought my new box of threads of 80wt Aurifil,  I have some duplicate spools from a previous purchase. I would love to share these with a couple of people who are interested in trying it out. I have two “collections” of 5 spools (one neutral, the other multi-colored). I will randomly choose 2 winner’s next Monday at 10pm EST.

To win one of these “collections”, leave a comment below letting me know your favorite applique tutorial and/or technique.

 

 

Save

In the Works {Update}

Keeping it real…I have made progress since my last post, though not as much as I hoped. At least its moving in the right direction.

So what’s happening…

From the releasing pattern front, I have managed to release the 3 pattern of 4 patterns (Abstract Triangles, Daughters Love and Altitudinal Ecosystem) with Mad Dash coming the first week in October. So overall completed all that I set out to do in September. YAY!!!

From a project perspective, they have all moved forward.

Sew Ready to Play Blog hop – The mastermind project, completed and posted a tutorial on Monday.

Mad Dash – binding is underway. I had some issues, with wonkiness when machine binding so switched to hand stitching it. I think its related to the pressure of the foot while stitching through 2 layers of batting. Only one side to go and this should be finished before the weekend.
maddash-binding
Sunday Best – My favorite project at the moment, and I finally got over the fear of what to do with the quilting and decided to just start. After all, a finished quilt is better than an unfinished one. Right??!! Here’s how I started…
sundaybest_quiltingblock1

I really love this block as a whole:
sundaybestquiltingorangepeel

Orange Creamsicle – all the blocks for the top are now complete. All hand-stitched. I just need to hand-stitch all the straight seams. This is slightly modified from what I posted on Instagram (IG), as I changed one of the blocks backgrounds for more balance (top right).orangecreamsicle_top
Lastly…
Directional Lines – Is a new project start but has a deadline of October 14th. It’s my #whatshadeareyou for RJR fabrics project. It is another improvisation project. Can I say I love this already and I have only done 8 lines.
directional-lines

Overall Project Plan

Here’s my overall project plan and recent changes.

Project Dates Current Status
 Mad Dash  September
(3rd FAL project)
TOP, BACK, BASTE, QUILT, BIND (underway)
 Sunday Best  September October
(4th FAL project)
TOP, BACK, BASTE, QUILT (underway), BIND
Sew Ready to Play Blog Hop  COMPLETED TOP, BACK, BASTE, QUILT, FRAME
 Orange Creamsicle  October TOP (underway) BACK, BASTE, QUILT, BIND
 Directional Lines  October TOP (underway), BACK, BASTE, QUILT, BIND
 Quilt Market Project  October TOP, BACK, BASTE, QUILT, BIND
 Fractions  October November
TOP, BACK, BASTE, QUILT, BIND
 NY High Line  November TOP, BACK, BASTE, QUILT, BIND
 Ode to Clothes  November December
TOP, BACK, BASTE, QUILT, BIND
 Beating Heart  November December
TOP, BACK, BASTE, QUILT, BIND

How are your projects going??

Save