Tag Archives: ALYoF

Q2 Planning – Goals

I have been feeling a little sluggish this quarter – though I probably accomplished more than I think. To do a better job of tracking my plans/finishes, I am going to re-commit to ALOYF and 2015 Finish Along.

My ButtonFirst up this month’s ALOYF, is the same as last months, but I must have about 2 hours maximum left on this project. That’s right, “It takes a Village” will be finished this month. I might even get the pattern finished too!!
Village_Quilting

So overall what are my plans and goals for the whole quarter:
mosaicc4ff693059186f82b758aae2868409c0dd779113

These projects are reflected in order in my table below.

Project Dates Current Status
 It takes a Village  April TOP, BACK, BASTE, QUILT, BIND
 Rangers Station
(my Marsala entry)
 20 April TOP, BACK, BASTE, QUILT, BIND
 Spoonflower Sampler Quilt  End of April TOP, BACK, BASTE, QUILT (UNDERWAY), BIND
 Design Evolution  End of April TOP, BACK, BASTE, QUILT, BIND
 Quilt Market Sampler  Early May TOP, BACK, BASTE, QUILT, BIND
 Tapa Star (Mini)  May TOP (UNDERWAY), BACK, BASTE, QUILT
 Bjorn the Bear  May TOP, BACK, BASTE, QUILT, BIND
 Altitudinal Zonation  Early June TOP, BACK, BASTE, QUILT, BIND
 Pushme, Pullme  June TOP (last-minute changes but almost complete),
BACK, BIND (Sending it out for quilting)
 Lines Drawn  June TOP, BACK, BASTE, QUILT, BIND

Let’s see what I complete – no pressure though….I will just get done what I get done!

2015 FAL at On the Windy Side

Two quick-ish WiPs and ALYoF Goal

I have two WiPs that were not on my large list for the month, that is my focus this week.
RoadSignsBlocks_Cut

The first project are my starter blocks for the Sisterhood of the Traveling Quilts. My idea was to use road signs with a “architectural” feel and a minimal color palette and lots of neutrals (this post has all the details and inspiration). I have cut out 4 of the 6 blocks and plan to finish these this weekend where they will be shipped out to Liz over @ beadqueene.

PhasedCircles_morequilting

The second project….you will laugh…but it is Phased circles again. I got really great feedback from the judges at QuiltCon on the lack of quilting for the inner circles, which I went back and forward on in my head for several weeks. So, more quilting is happening this week, as I may enter it in another show.
PhasedCircles_morequilting_back

My WiP that will be my goal for this month is a project you have seen glimpses of. I am 1/2 way through quilting but to be honest a little over it/bored with it.  To make sure I finish it….I need it to be my goal for “A lovely Year of Finishes” (see button on the right). Keep on quilting, keep on quilting.

Pyramid_QuiltDesign IMG_3310

Finally, I wanted to share my favorite photo from my instagram feed this week. Look how pretty my work place was in the snow last week.
SnowNC

Linking up with Lee over @ Freshly Pieced for WiP Wednesday (see button on the right).

 

 

December ALYoF

My goal this month is pretty simple, finish my spoonflower sample quilt. The top is all done, now only the back, quilting an binding to go.
Spoonflower Sampler Quilt Top
Since it has been a couple of weeks, here is also an update on my active projects.

Projects and Progress

Project Target Date Current Status
Phased Circles Quilt  COMPLETE  TOP, BACK, BASTE, QUILT, BIND
Spoonflower Sampler Quilt  31DEC2014 TOP, BACK, BASTE, QUILT, BIND
Celestial Spheres
(Part 1)
 DEC2014  TOP, BACK, BASTE, QUILT, BIND
Sew Mama Sew
(Project 3 – Peach Melba)
 COMPLETE  TOP, BACK, BASTE, QUILT, BIND
Sew Mama Sew
(Project 4)
26DEC2014 TOP, BACK, BASTE, QUILT, BIND
Bjorn the Bear  31DEC2014  TOP, BACK, BASTE, QUILT, BIND
Rangers Station  DEC2014  TOP, BACK, BASTE, QUILT, BIND
Schnitzel & Boo Mini Quilt JAN2014 TOP, BACK, BASTE, QUILT, BIND
Cheri 31JAN2014 TOP, BACK, BASTE, QUILT, BIND
Jungle Ave Tapa 31JAN2015 TOP, BACK (UNDERWAY), BASTE, QUILT, BIND

Linking up with Melissa @ Sew Bitter Sweet Designs for ALYoF (see button on the right).