Tag Archives: A year of lovely finishes

WiP Wednesday + November Goal

This week is the Triangle MQG retreat. I am so excited and have been preparing for the trip.  What am I focusing on during the retreat??? You guessed it, the blue Pushme Pullme Quilt (previously known as This way, That way).

I am thinking that I need 24 blocks – 6 rows. I have one row complete, and have now cut out 3 additional rows worth of blocks. Blocks Cut out

My goal is to complete at a minimum the top of the quilt by end of month. This is my “Lovely year of finishes” November Goal. I know, I know the same goal as last month but I really think it is possible this month.

I have been doing a lot of project planning at work this past week, so I created a mini one for my quilt. I am hoping to obviously finish more than just the top.

11/08/2013    All 24 blocks cut
11/16/2013    Finish sewing all blocks
11/21/2013    Finish sewing blocks together into rows and add sashing
11/30/2013    Finish Back, possibly basting complete

Using the same block I am also hoping to finish this mini quilt this weekend.
PushmePullme_Block1

So that is my WiP today and goal for this month.

My Button

WIP Wednesday at Freshly Pieced

Lovely year of finishes: May

It just seemed like yesterday I was doing the mid-month progress. This month was a little slower on my sewing/quilt projects than usual, however by no means was it slow in other aspects of my life :-).

My Button

I am linking up with “A lovely year of finishes” to share my end of May goals and successes.

Completed Projects in May

mosaic053710626fa2a76fc4eb75fe72d89630a898fb41

  • Madrona Road Mini Quilt
    Finished and posted here.
  • Chair Bags
    Completed and sent. See this post
  • Pot Holders
    Completed and received.

Projects Underway

mosaic06b5e406548f32a8a21f191aee0467a52bc38117

  • Hexagons (not sure for what yet)
    Underway
  • 18″ Pillow for Quilt Guild Pillow Swap
    Underway, pattern chosen – using a pillow pop design. Squares sewed and ready for cutting for HST’s
  • Finish machine quilting “Four Seasons in One Day” Quilt
    No more progress, posted here and here

 

 

Mid-May Goal check-in

Today, I am squeezing under the wire to report my mid-May goals update. I am linking up with “A lovely year of finishes”.

My Button

My goal for May was simple….finish 9 small projects (which included the list below)

  • Etsy order for Chair Bags
    Completed and sent. See this post
  • Madrona Road Mini Quilt
    Finished and posted yesterday.
    IMG_7339
  • 18″ Pillow for Quilt Guild Pillow Swap
    Underway, pattern chosen – using a pillow pop design. 
  • Finish machine quilting “Four Seasons in One Day” Quilt
    No more progress
  • Start one of the mini quilts (see side bar)
    Not started.

So overall, I don’t think to bad, about 50% of projects finished or underway. I also completed a set of pot holders which I blogged about here.